FRAMING!!!
ABOVE: West facing side with front door and bay window openings.
ABOVE: Prepping the roof. Windows arrive in 10 days. Once that happens, I can get the vapor barrier, siding, roofing installed.
ABOVE: View from south facing neighbor's yard. The ground level window is the bathroom.
ABOVE: A round window will be installed in the north facing living room wall.