Monday, November 6, 2023

 


                                           FRAMING!!!


ABOVE:  Framing has started.  The roof is steep with a Nordic aesthetic.




ABOVE:  West facing side with front door and bay window openings.




ABOVE:  Prepping the roof.  Windows arrive in 10 days.  Once that happens, I can get the vapor barrier, siding, roofing installed. 


 

ABOVE:  View from south facing neighbor's yard.  The ground level window is the bathroom.





ABOVE:  A round window will be installed in the north facing living room wall.




ABOVE:  Interior view of East facing wall.  The window shown is above the kitchen sink location.




ABOVE:  Interior view of South facing wall where the bathroom will be located.



  

ABOVE:  Interior view of loft space located above the bathroom.  



No comments:

Post a Comment

  UPDATE!  UPDATE! It's hard to believe I haven't posted since April.  It has been busy times for the backyard cottage. FLOORING I d...